STN BBS Controls
The STN BBS is controlled through the use of relay logic and PID controllers. No
PLC is required to operate the systems of wash and cure. Each of the sub-systems
will have separate integral controls for their operation.
STN BBS Material Handling
The STN BBS transfers the pistons in a Stainless Steel basket throughout the
process. Once the process has began the pistons will remain enclosed by the
equipment until they are ready for packaging. In the washer the pistons are head
up so that the wash and rinse solutions are not trapped. Baskets will allow for
processing a range of sizes and will accommodate long-eared or long skirted
pistons.
Baskets are loaded manually, either at the beginning of the process or at the
end of the machining process. Pistons are placed dome up in
Stainless Steel wire baskets that will hold the parts throughout the process.
The baskets are placed onto the feed conveyor of the washer and will be
automatically loaded into the washer.
The STN BBS Process
The process design is for the baskets to travel into the washer, automatically,
having been grabbed by the conveyor chains of the washer. Process flow is wash,
drain, rinse, drain, DI Mist and blow-off. These steps are carried out by the
automation of the washer.
The exit of the wash line enters into the application room, where the coating is
applied. Parts exiting the room return in the direction of travel from which
they came through a cure oven and then through a cool down chamber for handling.
|